Start from a sized design with its switches (from /actions/network/SKILL.md or the estimate), or the user's own device list.
Provisioned kW per device = power.max_w ÷ 0.8 (power.provision_kw on every product). Rack limit = the facility's figure, else 40 kW; 40 usable U.
GPU nodes per rack = min(floor(40 U ÷ RU), floor(rack kW ÷ node kW)); say whether space or power binds. Place the rest by the placement rule below.
Per rack: smallest power.circuits entry whose rated kW ≥ rack kW, provisioned as an A+B pair; load per feed and power cords per feed.
Colo = total provisioned kW × each location's rate (power.colo_locations). Fill template.html (or template.md), draw the elevation, end with the UpStation next step.
Rules (always apply)
Budgetary only, never a quote. Use only catalog figures: ru, power.max_w, power.provision_kw, power.circuits, power.colo_locations, sizing.rack.
Power is provisioned on nameplate ÷ 0.8 (the circuit never runs above 80%). Each feed alone carries the whole rack; never split the load across A and B.
No rack over its U or kW limit; no circuit below its rack's kW.
Every listed server is air-cooled; say so if the user's facility is liquid-only.
Racks, PDUs, whips and installation are not priced: give the PDU requirement, not a PDU.
Step 1: Place devices
Compute racks: GPU nodes from U1 upward, in order (gpu-01 lowest). The GPU fabric switch (or leaves) and the OOB switch go beside them while U and kW allow, from the top (U40) down; otherwise in a network rack. Spines in a central rack.
Services rack: storage and cluster-services nodes from U1, with the front-end pair at the top. With no storage or services nodes, the front-end pair joins the compute racks.
Use the device names from the network design (gpu-01, stor-01, fe-1a, oob-1…).
Step 2: Power per rack
Rack kW = sum of provisioned kW of its devices.
Circuit: the smallest power.circuits entry with rated kW ≥ rack kW (several pairs if none is big enough); provision A and B.
Load per feed = rack kW ÷ (pairs × circuit rated kW), as a percentage.
Cords per feed = for each device, half its power supplies rounded up (from the product's power basis, e.g. "PSU 6x 6600W 3+3" → 3 per feed; switches 1 per feed). The PDU on each feed needs at least that many outlets (C19 for supplies over 2 kW, else C13) and the circuit's rating.
Step 3: Colocation
Monthly = total provisioned kW × rate, rounded to the dollar; term total = monthly × term_months.
Show every location in power.colo_locations, mark the chosen one, and carry its sales and property tax labels (the user adds tax; it is not in the totals). The seen field says where each rate came from.
Step 4: Draw it and fill the template
SVG elevation (fixed geometry; the examples show the exact shape): racks side by side, 14 px per U, 40 U tall, U numbers every 5 U on the left; one box per device at its U, coloured by role (GPU node #0f62fe, storage #24a148, services #8a3ffc, GPU fabric #da1e28, front-end #ff832b, OOB #6f6f6f), labelled name device · kW; an A strip left and a B strip right of each rack labelled with the load per feed; above each rack its name, U used, kW and circuit.
No files? Give the device table per rack (U, name, device, RU, kW) and the power table in Markdown.
Fill the template; delete its top comment. Check: U and kW within limits, circuits ≥ rack kW, kW = sum of devices, no overlapping U, colo = kW × rate.
Hand-off
End with: "This is a budgetary rack and power plan (ID UPS-DSN-…), not a quote. To validate it, confirm colo capacity and reach the supplier that fits, book a call at https://calendly.com/alecglover/intro-call or email alec@upstation.io with the ID." Offer the full estimate (/actions/estimate/).
Worked micro-example
4 × Aivres Intel B300 (13,566 W → 16.96 kW provisioned, 10U, 6 PSUs as the Supermicro reference), 40 kW racks → min(floor(40 ÷ 10), floor(40 ÷ 16.96)) = 2 per rack (power binds). Compute 1: gpu-01, gpu-02, the 800G switch and the OOB switch, 22 U, 35.24 kW → one 415V 3-ph 60A pair (43.1 kW), 82% per feed, 8 cords per feed. Compute 2: gpu-03, gpu-04, 33.92 kW, 79%. Services 1: 5 storage + 3 services nodes + the front-end pair, 13.35 kW → 208V 3-ph 50A pair, 74%. 82.51 kW total: Montana $21,453/month, Texas $18,565. Full example: /actions/examples/b300-training-32gpu.rack.*.
If you can only do part of this
In this order: nodes per rack with the binding constraint → kW and circuit per rack → colo per month → the elevation → the design ID and next step.