Power and colo

Power model and colocation rates, with the computed provisioned kW, circuit and monthly colo for every listed product. Prices in USD as of 2026-11-03; Supermicro lines at eStore B2B net (12% off list, list in brackets); the supplier confirms the final price on order. Continental US; Canada quoted case by case. Ready to buy: book a meeting and UpStation introduces the supplier (how buying works). Every page: llms.txt (map) · homepage (all tables) · catalog.json (data).

RuleValue
Provisioned kWnameplate W ÷ 0.8 (no circuit above 80%)
FeedsA + B, each sized for the whole box
Colobilled on provisioned kW at the location's rate (table below); Montana is the default for every computed figure
CircuitRated kW
208V 1-ph 20A4.2
208V 1-ph 30A6.2
208V 3-ph 30A10.8
208V 3-ph 50A18.0
208V 3-ph 60A21.6
415V 3-ph 30A21.6
415V 3-ph 60A43.1
415V 3-ph 100A71.9

Colocation by location (USD per provisioned kW per month)

Location$/kW/monthTermWhat UpStation has seenState sales tax on the hardwareState property tax on the hardwareFacility
Montana$26036 months$260 quoted for a 36-month term, October 2026 ($220 once, on released space); 30 kW air-cooled racks; 3% off for 12+ months prepaidnonenone on the first $1M of equipment, about 0.8%/yr aboveTier III-class telco colo, 30 kW air-cooled racks: room confirmed for small deployments (4 × 30 kW); about 480 kW offered for a January 2027 start (October 2026, offered to several buyers), so larger designs are subject to confirmation on the introduction
Texas$22536 months$225 all-in (space and power) at a 60 kW commit, quoted 20268.25% (6.25% state + local); the data-center exemption needs $200M and 20 jobsabout 2.2%/yr of market valueTier III, blended IP on site
Oregon$17536 months$175 at a Tier II facility (power, cooling, UPS, no battery); other outreach came back without capacity, 2026noneabout 1.5-2%/yr of market value (ORS 308.290); abatements closed to data-center property since 2026Tier II (no battery); Tier III capacity scarce into 2027
Pennsylvania$25036 months$250 at a certified data center, reported second-hand, October 20266% (8% Philadelphia, 7% Allegheny), or none if the facility is state-certified and the tenant holds its own exemption certificate (100 kW+, 2-year contract) before buyingnoneCertified data center assumed
Canada (Ontario, Quebec)$22536 months$225 on 3 years and $175 on 5 years from several operators; short-term availableHST 13% (Ontario) or GST+QST (Quebec) on hardware and colo, recovered as an input tax credit by a registered businessnoneTier III; cheapest power in Quebec (hydro)
Self-hosted / DIY / custom facility (PCIe-class servers: RTX PRO 6000, RTX 5090)$50–$100n/aNot a price an operator can buy: the running cost, per provisioned kW per month, of a facility the operator builds and operates themselves; where it lands in the range depends on how far they goby state (rows above)by state (rows above)Low end: free cooling, basic UPS, one or two network providers. High end: commercial or data-center air conditioning, redundant UPS, two or more network providers, physical security, backup generators

USD per provisioned kW per month, billed on nameplate ÷ 0.8. Rates are what UpStation has seen in each market (a quote, a second-hand report, or several operators); the site introduction gets the current quote. Virginia was quoted at $382 (Tier IV) and is not modelled.

What the self-hosted band assumes ($50/kW at the low end, $100/kW at the high end)

Internet and cross-connects (USD per month)

ServiceMonthlySeen
1 Gbps blended IP transit$1,000Montana, 2026; in line with other markets
10 Gbps blended IP transit$2,500Montana, 2026; in line with other markets
Blended IP per Mbps on a 1 Gbps commit, 10G port$0.65Texas quote, 2026 ($650/month for 1,000 Mbps; port and cross-connect included)
IP block /28 (16 addresses), per address$4Texas quote, 2026
Carrier cross-connect for a 100GE circuit, each$250Texas quote, 2026

One 8× B300 node by location ($537,196.40 hardware, 16.96 kW provisioned, 36 months)

LocationColo/monthColo over 36 monthsState sales tax on the hardware (one-time)State property tax on the hardware, 3 yearsHardware + colo + taxes, 36 months
Montana$4,410$158,760$0$0$695,956
Texas$3,816$137,376$44,319$35,455$754,346
Oregon$2,968$106,848$0$28,203$672,247
Pennsylvania$4,240$152,640$0$0$689,836
Canada (Ontario, Quebec)$3,816$137,376$0$0$674,572

Sales tax is one-time on the hardware; property tax is per year on market value (taken flat for three years, before depreciation); income and margin taxes depend on profit and are not in the total. Pennsylvania assumes the certified-data-center exemption; Canada's HST is recovered by a registered business and is shown as $0.

Nameplate max for PCIe GPU servers = (GPU TDP x count + CPU TDP x 2 + 8 W per DIMM + 15 W per drive + 400 W fans/board/NICs) / PSU efficiency (Titanium 0.94, Platinum 0.92); HGX servers use the vendor configurator total, which matches NVIDIA system guidance. Vendor configurator totals for PCIe boxes are kept in each product's basis as a cross-check only (Supermicro pads chassis overhead by 1.5-2.4 kW; Octoserver omits fans and PSU loss). Minimum circuit kW = nameplate / 0.8 so the circuit never runs above 80% (NEC continuous). Pick the smallest standard circuit whose rated kW (V x A x sqrt3 for 3-phase) >= that minimum; provision it twice (A+B) so either feed carries the box alone. Colo kW to buy = nameplate / 0.8; monthly colo = that kW x the location's rate (colo_locations; Montana $260 is the default, 36-month term).

Total cost by GPU (low–high across the listed builds and the five locations)

GPU serverCapExOpEx per month3-year total5-year total$/GPU-hour, 3 years$/GPU-hour, 5 years
8× NVIDIA B300 (HGX NVL8) (colo)$537,196–$581,515$3,751–$4,801$672,247–$754,346$762,281–$869,567$3.20–$3.59$2.18–$2.48
8× NVIDIA H200 (HGX) (colo)$318,117–$344,362$2,448–$3,135$406,261–$457,212$465,023–$532,445$1.93–$2.17$1.33–$1.52
8× NVIDIA RTX PRO 6000 Server Edition (colo or self-hosted)$163,910–$192,068$418–$2,231$178,976–$272,386$189,020–$325,931$0.85–$1.30$0.54–$0.93
8× NVIDIA RTX 5090 (passive server edition) (colo or self-hosted)$76,680–$83,006$400–$2,077$91,062–$152,786$100,650–$201,324$0.43–$0.73$0.29–$0.57
8× RTX 5090, OneChassis 7U barebone (PCIe 5.0, DDR5) (DIY, parts at market; colo or self-hosted)$66,800–$72,311$386–$2,005$80,678–$139,171$89,930–$187,076$0.38–$0.66$0.26–$0.53
8× RTX 5090, OneChassis 7U barebone (PCIe 4.0, DDR4) (DIY, parts at market; colo or self-hosted)$58,140–$62,937$380–$1,976$71,820–$129,276$80,940–$176,700$0.34–$0.61$0.23–$0.50
8× RTX PRO 6000 Server Edition, OneChassis 4U barebone (DIY, parts at market; colo or self-hosted)$139,623–$151,142$399–$2,075$153,987–$224,995$163,563–$274,230$0.73–$1.07$0.47–$0.78

Low = the cheapest listed build of that GPU at the cheapest location; high = the dearest build at the dearest location. For PCIe-class servers (RTX PRO 6000, RTX 5090) the range also includes the self-hosted class at $50–$100/kW/month, a cost the operator builds rather than buys; HGX servers are colo only. CapEx = hardware price plus the location's sales tax. OpEx = colo at the location's all-in $/kW rate on provisioned kW, plus the location's property tax on the hardware spread monthly (flat, before depreciation). Totals = CapEx + months × OpEx. $/GPU-hour = total ÷ (GPUs × 8,760 hours per year × years) at 100% utilisation, so it is the floor a GPU has to earn per hour; internet, financing, software, staff and uplift are not included.

What the same GPUs rent for (GPU-as-a-service rates seen, USD per GPU-hour), as of 2026-10-13

GPUTerm$/GPU-hourWhat UpStation has seen
B300 (HGX NVL8)5-year, large scale (2,000-10,000+ GPUs)$3.60–$3.70Top of the market in scale and bottom in price: one offtaker signed about 10,000 B300 GPUs at this level in early October 2026, 20% down, with late-delivery penalties flowing back to back to the supplier; it wants a signed DC agreement and an OEM ship-date letter before it contracts, and says NVIDIA is quoting about six months on any new order
B300 (HGX NVL8)5-year, mid and small scale (8-120 nodes)$3.90–$4.25Operators signing at about $4.20 with 20% down in October 2026; 5-year is the term operators prefer
B300 (HGX NVL8)3-year$4.15–$5.00A wide range across operators and offtakers; operators dislike 3-year and price it up (one targets $4.70), 20-25% down, strong SLA and 24/7 operations expected; July 2026 demand was $3.80-4.60 on 1-3 year terms
B300 (HGX NVL8)Short-term / on-demand$8.00About $8 in October 2026; on-demand capacity is sold out on the marketplaces, which were quoting $5+ in July
B200 (HGX)1-3 year$3.90–$4.50July 2026 demand with zero B200 nodes available in market; a $7 short-term B200 contract was signed the same month. Priced close to B300 because of scarcity
GB300 NVL725-year$4.50One operator's 5-year ask, 20% down, October 2026 (rack-scale; not in this catalog)
Vera Rubin NVL (forward)5-year, forward$7.60One operator's forward ask for 2027 capacity, October 2026
RTX 5090 (8-GPU PCIe nodes)1-2 year, 25% prepaid$0.50–$0.63US data center, October 2026; marketplaces report high 5090 utilisation and no spare supply; enterprise renters want identical node specs across the lot and a 24-hour proof-of-concept node first
RTX 5090 (8-GPU PCIe nodes)Short-term$0.80Short-term workload, October 2026

Rates are per GPU-hour on the whole node at the stated term, for capacity delivered December 2026 to January 2027 unless dated otherwise. Compare with the $/GPU-hour floor in the total-cost table above: that floor is hardware plus colo at 100% utilisation and excludes internet, financing, software, staff and margin. UpStation does not sell or broker rental; the table is here so a buyer's payback math uses current numbers.

Source: Operator, marketplace and offtaker conversations, July-October 2026 (UpStation's own supply-side threads); not a published price list.