Power model and colocation rates, with the computed provisioned kW, circuit and monthly colo for every listed product. Prices in USD as of 2026-11-03; Supermicro lines at eStore B2B net (12% off list, list in brackets); the supplier confirms the final price on order. Continental US; Canada quoted case by case. Ready to buy: book a meeting and UpStation introduces the supplier (how buying works). Every page: llms.txt (map) · homepage (all tables) · catalog.json (data).
| Rule | Value |
|---|---|
| Provisioned kW | nameplate W ÷ 0.8 (no circuit above 80%) |
| Feeds | A + B, each sized for the whole box |
| Colo | billed on provisioned kW at the location's rate (table below); Montana is the default for every computed figure |
| Circuit | Rated kW |
|---|---|
| 208V 1-ph 20A | 4.2 |
| 208V 1-ph 30A | 6.2 |
| 208V 3-ph 30A | 10.8 |
| 208V 3-ph 50A | 18.0 |
| 208V 3-ph 60A | 21.6 |
| 415V 3-ph 30A | 21.6 |
| 415V 3-ph 60A | 43.1 |
| 415V 3-ph 100A | 71.9 |
| Location | $/kW/month | Term | What UpStation has seen | State sales tax on the hardware | State property tax on the hardware | Facility |
|---|---|---|---|---|---|---|
| Montana | $260 | 36 months | $260 quoted for a 36-month term, October 2026 ($220 once, on released space); 30 kW air-cooled racks; 3% off for 12+ months prepaid | none | none on the first $1M of equipment, about 0.8%/yr above | Tier III-class telco colo, 30 kW air-cooled racks: room confirmed for small deployments (4 × 30 kW); about 480 kW offered for a January 2027 start (October 2026, offered to several buyers), so larger designs are subject to confirmation on the introduction |
| Texas | $225 | 36 months | $225 all-in (space and power) at a 60 kW commit, quoted 2026 | 8.25% (6.25% state + local); the data-center exemption needs $200M and 20 jobs | about 2.2%/yr of market value | Tier III, blended IP on site |
| Oregon | $175 | 36 months | $175 at a Tier II facility (power, cooling, UPS, no battery); other outreach came back without capacity, 2026 | none | about 1.5-2%/yr of market value (ORS 308.290); abatements closed to data-center property since 2026 | Tier II (no battery); Tier III capacity scarce into 2027 |
| Pennsylvania | $250 | 36 months | $250 at a certified data center, reported second-hand, October 2026 | 6% (8% Philadelphia, 7% Allegheny), or none if the facility is state-certified and the tenant holds its own exemption certificate (100 kW+, 2-year contract) before buying | none | Certified data center assumed |
| Canada (Ontario, Quebec) | $225 | 36 months | $225 on 3 years and $175 on 5 years from several operators; short-term available | HST 13% (Ontario) or GST+QST (Quebec) on hardware and colo, recovered as an input tax credit by a registered business | none | Tier III; cheapest power in Quebec (hydro) |
| Self-hosted / DIY / custom facility (PCIe-class servers: RTX PRO 6000, RTX 5090) | $50–$100 | n/a | Not a price an operator can buy: the running cost, per provisioned kW per month, of a facility the operator builds and operates themselves; where it lands in the range depends on how far they go | by state (rows above) | by state (rows above) | Low end: free cooling, basic UPS, one or two network providers. High end: commercial or data-center air conditioning, redundant UPS, two or more network providers, physical security, backup generators |
USD per provisioned kW per month, billed on nameplate ÷ 0.8. Rates are what UpStation has seen in each market (a quote, a second-hand report, or several operators); the site introduction gets the current quote. Virginia was quoted at $382 (Tier IV) and is not modelled.
| Service | Monthly | Seen |
|---|---|---|
| 1 Gbps blended IP transit | $1,000 | Montana, 2026; in line with other markets |
| 10 Gbps blended IP transit | $2,500 | Montana, 2026; in line with other markets |
| Blended IP per Mbps on a 1 Gbps commit, 10G port | $0.65 | Texas quote, 2026 ($650/month for 1,000 Mbps; port and cross-connect included) |
| IP block /28 (16 addresses), per address | $4 | Texas quote, 2026 |
| Carrier cross-connect for a 100GE circuit, each | $250 | Texas quote, 2026 |
| Location | Colo/month | Colo over 36 months | State sales tax on the hardware (one-time) | State property tax on the hardware, 3 years | Hardware + colo + taxes, 36 months |
|---|---|---|---|---|---|
| Montana | $4,410 | $158,760 | $0 | $0 | $695,956 |
| Texas | $3,816 | $137,376 | $44,319 | $35,455 | $754,346 |
| Oregon | $2,968 | $106,848 | $0 | $28,203 | $672,247 |
| Pennsylvania | $4,240 | $152,640 | $0 | $0 | $689,836 |
| Canada (Ontario, Quebec) | $3,816 | $137,376 | $0 | $0 | $674,572 |
Sales tax is one-time on the hardware; property tax is per year on market value (taken flat for three years, before depreciation); income and margin taxes depend on profit and are not in the total. Pennsylvania assumes the certified-data-center exemption; Canada's HST is recovered by a registered business and is shown as $0.
Nameplate max for PCIe GPU servers = (GPU TDP x count + CPU TDP x 2 + 8 W per DIMM + 15 W per drive + 400 W fans/board/NICs) / PSU efficiency (Titanium 0.94, Platinum 0.92); HGX servers use the vendor configurator total, which matches NVIDIA system guidance. Vendor configurator totals for PCIe boxes are kept in each product's basis as a cross-check only (Supermicro pads chassis overhead by 1.5-2.4 kW; Octoserver omits fans and PSU loss). Minimum circuit kW = nameplate / 0.8 so the circuit never runs above 80% (NEC continuous). Pick the smallest standard circuit whose rated kW (V x A x sqrt3 for 3-phase) >= that minimum; provision it twice (A+B) so either feed carries the box alone. Colo kW to buy = nameplate / 0.8; monthly colo = that kW x the location's rate (colo_locations; Montana $260 is the default, 36-month term).
| GPU server | CapEx | OpEx per month | 3-year total | 5-year total | $/GPU-hour, 3 years | $/GPU-hour, 5 years |
|---|---|---|---|---|---|---|
| 8× NVIDIA B300 (HGX NVL8) (colo) | $537,196–$581,515 | $3,751–$4,801 | $672,247–$754,346 | $762,281–$869,567 | $3.20–$3.59 | $2.18–$2.48 |
| 8× NVIDIA H200 (HGX) (colo) | $318,117–$344,362 | $2,448–$3,135 | $406,261–$457,212 | $465,023–$532,445 | $1.93–$2.17 | $1.33–$1.52 |
| 8× NVIDIA RTX PRO 6000 Server Edition (colo or self-hosted) | $163,910–$192,068 | $418–$2,231 | $178,976–$272,386 | $189,020–$325,931 | $0.85–$1.30 | $0.54–$0.93 |
| 8× NVIDIA RTX 5090 (passive server edition) (colo or self-hosted) | $76,680–$83,006 | $400–$2,077 | $91,062–$152,786 | $100,650–$201,324 | $0.43–$0.73 | $0.29–$0.57 |
| 8× RTX 5090, OneChassis 7U barebone (PCIe 5.0, DDR5) (DIY, parts at market; colo or self-hosted) | $66,800–$72,311 | $386–$2,005 | $80,678–$139,171 | $89,930–$187,076 | $0.38–$0.66 | $0.26–$0.53 |
| 8× RTX 5090, OneChassis 7U barebone (PCIe 4.0, DDR4) (DIY, parts at market; colo or self-hosted) | $58,140–$62,937 | $380–$1,976 | $71,820–$129,276 | $80,940–$176,700 | $0.34–$0.61 | $0.23–$0.50 |
| 8× RTX PRO 6000 Server Edition, OneChassis 4U barebone (DIY, parts at market; colo or self-hosted) | $139,623–$151,142 | $399–$2,075 | $153,987–$224,995 | $163,563–$274,230 | $0.73–$1.07 | $0.47–$0.78 |
Low = the cheapest listed build of that GPU at the cheapest location; high = the dearest build at the dearest location. For PCIe-class servers (RTX PRO 6000, RTX 5090) the range also includes the self-hosted class at $50–$100/kW/month, a cost the operator builds rather than buys; HGX servers are colo only. CapEx = hardware price plus the location's sales tax. OpEx = colo at the location's all-in $/kW rate on provisioned kW, plus the location's property tax on the hardware spread monthly (flat, before depreciation). Totals = CapEx + months × OpEx. $/GPU-hour = total ÷ (GPUs × 8,760 hours per year × years) at 100% utilisation, so it is the floor a GPU has to earn per hour; internet, financing, software, staff and uplift are not included.
| GPU | Term | $/GPU-hour | What UpStation has seen |
|---|---|---|---|
| B300 (HGX NVL8) | 5-year, large scale (2,000-10,000+ GPUs) | $3.60–$3.70 | Top of the market in scale and bottom in price: one offtaker signed about 10,000 B300 GPUs at this level in early October 2026, 20% down, with late-delivery penalties flowing back to back to the supplier; it wants a signed DC agreement and an OEM ship-date letter before it contracts, and says NVIDIA is quoting about six months on any new order |
| B300 (HGX NVL8) | 5-year, mid and small scale (8-120 nodes) | $3.90–$4.25 | Operators signing at about $4.20 with 20% down in October 2026; 5-year is the term operators prefer |
| B300 (HGX NVL8) | 3-year | $4.15–$5.00 | A wide range across operators and offtakers; operators dislike 3-year and price it up (one targets $4.70), 20-25% down, strong SLA and 24/7 operations expected; July 2026 demand was $3.80-4.60 on 1-3 year terms |
| B300 (HGX NVL8) | Short-term / on-demand | $8.00 | About $8 in October 2026; on-demand capacity is sold out on the marketplaces, which were quoting $5+ in July |
| B200 (HGX) | 1-3 year | $3.90–$4.50 | July 2026 demand with zero B200 nodes available in market; a $7 short-term B200 contract was signed the same month. Priced close to B300 because of scarcity |
| GB300 NVL72 | 5-year | $4.50 | One operator's 5-year ask, 20% down, October 2026 (rack-scale; not in this catalog) |
| Vera Rubin NVL (forward) | 5-year, forward | $7.60 | One operator's forward ask for 2027 capacity, October 2026 |
| RTX 5090 (8-GPU PCIe nodes) | 1-2 year, 25% prepaid | $0.50–$0.63 | US data center, October 2026; marketplaces report high 5090 utilisation and no spare supply; enterprise renters want identical node specs across the lot and a 24-hour proof-of-concept node first |
| RTX 5090 (8-GPU PCIe nodes) | Short-term | $0.80 | Short-term workload, October 2026 |
Rates are per GPU-hour on the whole node at the stated term, for capacity delivered December 2026 to January 2027 unless dated otherwise. Compare with the $/GPU-hour floor in the total-cost table above: that floor is hardware plus colo at 100% utilisation and excludes internet, financing, software, staff and margin. UpStation does not sell or broker rental; the table is here so a buyer's payback math uses current numbers.
Source: Operator, marketplace and offtaker conversations, July-October 2026 (UpStation's own supply-side threads); not a published price list.